Site currently under construction.

Loading...

Ideo New Rama 9

  Ready to Move in, Ideo Rama 9, new cut
  380 m. MRT Ramkhamhaeng 12 *
   Full recovery * with proposals that cannot be missed.
   Start 2.39 MB.

Register for special privileges

Location and design

Prime Location

The location that can enter the city center quickly And various routes, either Airport Rail Link, MRT or by boat, surrounded by Facilities around Both department stores, supermarkets, international schools And leading hospitals for you to enjoy both leisure and lifestyle.
 

Convenient facilities

Make all your activities most effective. 
Lobby that can be used as a work place. Or meeting in the natural atmosphere (LIVE + WORK) indoor exercise area That connects to the external green space (LIVE + PLAY) or even Co-working Space & Library that allows you to adjust the mode to rest and work immediately (WORK + PLAY)

 

Location and design

Life Ideo Hybrid Series Based on the concept of Ideo Which focuses on responding to the urban living function of the IDEO Hybrid Series, a concept that combines innovation with the urban lifestyle, reflecting both from architecture Landscape architecture Interior decoration As well as security systems That has combined perfectly To support the diversity of urban lifestyle.

Super Convenience 

2 MASS TRANSIT RAILWAY 
• Approximately 380 meters * from the MRT Ramkhamhaeng Station 12 * 
• About 800 meters ** from Airport rail link Ramkhamhaeng Station 

2 Expressways 
• 3 km from Si Rat Expressway 
• 6 km from 

1 Pier Motorway 
• 800 m *** from The Mall 3 Pier

Project Information

Project area: 4-3-76.3 rai
Total number of suites: 996 units
 
Number of residential units: 994 units

Number of suites for commercial purposes: 2 units

Number of parking spaces: 344 cars

Number of floors: 24 floors

Number of elevators: 4 characters

Number of transport lifts: 1 body
Basement: System room

G floor: Reception Hall, Mail Room, Corporate Office, Swimming Pool, Garden, Shop, Parking, Social Club

2nd floor: Co-working space, laundry room, meeting room, gym, parking

3rd floor: Parking

Floor 4-5: Car park, condominium

6-18 floor: Condominium

Floor 19-24: Condominium

Rooftop: garden

Overall progress

Project is Completed
100 %
Latest update 28 March 2019
Main contractor company: Pornpranakorn Public Company Limited
100% structural work
100% system work
100% architectural work
100% completed pile work

FLOORPLAN

LOCATION

Ramkhamhaeng Road, Hua Mak Subdistrict, Bang Kapi District
+66 2 316 2222
5d579da749952_map.png

Related Projects